logo
Get In Touch

How We Makethe World WorkBetter

What we engineer directly shapes the environment and the wellbeing of the people and organisations who use it. Across 1000+ projects in 8 countries, our work has made a measurable difference to communities, businesses and the planet we share.

Hospitality projects bring together guest experience, operational requirements, energy performance and demanding building services. Beratung brings MEP design and sustainability expertise across hotels, resorts and hospitality facilities, adapting engineering solutions to the scale, character and operational needs of each project.

Café & Commercial Kitchen

Café & Commercial Kitchen

Delivering operational excellence through disciplined and precise MEPF engineering design.

  • Capacity: 105 MW
  • Location: Hyderabad
  • Service: Testing and Commissioning
Eco-Luxury Resort

Eco-Luxury Resort

Achieving LEED Platinum certification, reflecting a strong commitment to sustainability and environmental stewardship.

  • Area: 2,70,000 sq ft
  • Location: Phaltan, Maharashtra
  • Service: Sustainability, LEED Platinum
Luxury Hotel

Luxury Hotel

Demonstrating a commitment to sustainable practices through LEED Silver certification.

  • Area: 5,00,000 sq ft
  • Location: Goa
  • Service: Sustainability, LEED Silver
Elephant Kitchen

Elephant Kitchen

Achieving operational excellence through rigorous and precise MEPF engineering design.

  • Area: 7,500 sq ft
  • Location: Jamnagar
  • Service: Engineering design

Case Studies

Hyperscale Data Center Commissioning Under Pressure
Independent Mechanical IST Verification for a Data Center in GIFT City
Data Centers

Independent Mechanical IST Verification for a Data Center in GIFT City

Bringing independent verification to a critical testing stage, so a global data center operator could move towards operations with confidence.

Integrated Systems Testing for a Corporate Office in Worli
Commercial

Integrated Systems Testing for a Corporate Office in Worli

Bringing a corporate office through integrated systems testing on schedule, as part of a complete testing and commissioning scope.

Phase by Phase: Commissioning Validation for a 40 MW Hyperscale Data Center
Data Centers

Phase by Phase: Commissioning Validation for a 40 MW Hyperscale Data Center

Validating critical systems for a 40 MW hyperscale data center through integrated systems testing as part of Commissioning Validation.

Technical Due Diligence Before a Lease Commitment
Commercial

Technical Due Diligence Before a Lease Commitment

Giving a global banking client a clearer technical picture before committing to two commercial office assets.

Standardizing MEP Design Guidelines Across a Pan-India Portfolio
Commercial

Standardizing MEP Design Guidelines Across a Pan-India Portfolio

Creating a consistent MEP design framework for a banking client's future projects across India.

Commissioning a 400,000 Sq Ft Technology Office From the Ground Up
Commercial

Commissioning a 400,000 Sq Ft Technology Office From the Ground Up

Embedding commissioning into the project from design through testing and handover.

Design-Stage Commissioning Planning for a 4 MW Data Center
Data Centers

Design-Stage Commissioning Planning for a 4 MW Data Center

Bringing commissioning requirements into the design of a 4 MW data center from the outset.

Closing a Missing Redundancy Path in a UPS Cooling System
MEP Engineering

Closing a Missing Redundancy Path in a UPS Cooling System

Identifying a critical gap in the power redundancy strategy for a VRF-cooled UPS room.

Resolving a UPS Maintenance Bypass Interlocking Issue
MEP Engineering

Resolving a UPS Maintenance Bypass Interlocking Issue

Reworking the bypass arrangement to enable safe UPS maintenance without interrupting the protected load.

Factory-Calibrating VAV Boxes to Streamline Air Balancing
MEP Engineering

Factory-Calibrating VAV Boxes to Streamline Air Balancing

Moving part of the air-balancing process upstream to reduce commissioning time on a fast-track project.

Catching a Chilled Water Shortfall Before Construction
MEP Engineering

Catching a Chilled Water Shortfall Before Construction

Identifying a chilled water flow mismatch during design review before it reached site.

Proving a New Cooling Concept Before Committing to It
MEP Engineering

Proving a New Cooling Concept Before Committing to It

Testing an unfamiliar cooling approach against project requirements before full-scale implementation.

From Design Review to Ongoing Site Support: Mumbai Corporate Office
Commercial

From Design Review to Ongoing Site Support: Mumbai Corporate Office

Bringing design, execution, and client requirements together on a Mumbai corporate office project.

Zero-Energy STP: From Advisory to Active Delivery
Industrial — Logistics & Manufacturing

Zero-Energy STP: From Advisory to Active Delivery

Helping a manufacturing client move from exploring zero-energy treatment to implementing it under a compressed timeline.

Recovering a Delay Mid-Commissioning: A Corporate Fit-Out in Hyderabad
Commercial

Recovering a Delay Mid-Commissioning: A Corporate Fit-Out in Hyderabad

Helping a 110,000 sq ft corporate fit-out reach handover on schedule through structured commissioning and integrated systems testing.

Our Presence

Map of our project locations
Sweden
Nigeria
Saudi
Dubai
India
Malaysia
Singapore
Uzbekistan