logo
Get In Touch
Home/Case Studies/Resolving a UPS Maintenance Bypass Interlocking Issue
Back to all case studies
MEP EngineeringNovember 5, 2026

Resolving a UPS Maintenance Bypass Interlocking Issue

Reworking the bypass arrangement to enable safe UPS maintenance without interrupting the protected load.

Resolving a UPS Maintenance Bypass Interlocking Issue

The Requirement

The UPS was designed with a master bypass arrangement so that the load could remain supplied while the UPS was taken offline for maintenance. A review of the wiring identified two issues that affected how the bypass would operate in practice. The existing arrangement created a back-feed risk when the UPS was isolated, while the shunt-trip interlock could also trip the bypass breaker when the UPS was switched off for service.

The Engineering Review

Both issues needed to be addressed together. Resolving one without the other would have left the bypass arrangement exposed to another operating constraint. Beratung reviewed the power path and interlocking arrangement to determine how the UPS output and bypass could be isolated and transferred safely.

The Solution

The arrangement was modified in two ways:

The interlock uses a single physical key to control access to the two breaker positions, ensuring that the two paths cannot be live simultaneously. The key position also controls whether the UPS inverter is blocked or unblocked.

The Outcome

The revised arrangement allows the UPS to be taken fully offline for maintenance while maintaining the intended bypass supply to the load. The solution was accepted by the project team and implemented on site, providing a controlled interlocking arrangement between the UPS output and maintenance bypass.

Back to all case studies