The Design Question

The client was considering underfloor cooling for office areas across a multi-building campus. The concept required equipment and automated controls that had not previously been demonstrated in operation by the project team. Before committing to the approach at full scale, the team needed to establish whether the proposed equipment could perform against the project's actual requirements.

Testing the Concept

Beratung supported the development of a mock-up space based on the project's specifications. Shortlisted vendors' AHUs were factory-inspected before shipment and then installed individually in the mock-up for testing. The team assessed airflow, static pressure, speed control, and operational performance under the project-specific conditions. This allowed the equipment to be evaluated directly rather than relying solely on proposed performance information.

Refining the System

The testing provided a basis for comparing the shortlisted equipment and identifying which option was suitable for the project. It also brought control-logic issues and tuning requirements to light while changes could still be made before full-scale implementation.

The Impact

The exercise gave the project team evidence on equipment performance before committing to the full installation. It helped narrow the vendor selection, resolve control and tuning requirements early, and provide greater confidence in taking the new cooling concept forward.